Live drainage connection, Knowsley Industrial park.
- Mar 15, 2016
- 1 min read
Today one of our teams has made a live drainage connection. Connecting from a soon to be wet room in a new building, through a pan shuttered reinforced concrete wall and then linking in to an existing man hole. Realising a few months back when casting the reinforced wall that it may be likely the building may require unforeseen services in the future. Plans are never set in stone, We inserted a piece of 9" twin wall between our pan shutters, bellow finished floor level. Taking very little time then but saving us lots of time today.
Sewerage drain, Merseyside Drain connection, Merseyside Pipe bedding, Merseyside































Comments